Dual-Channel FADEC Engine Control ECU

Product family: Vibration-Isolated Engine Units.

Flow: Ceramic-PCB & connector supplier → Thick-Film Ceramic Screen → Vapor-Phase Reflow & Wash → Elastomeric Shock Isolator → Burn-In +125°C Hot Soak → Full Engine Sim MIL-Bus ATE → Turbofan Fan Case Mount

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Channel FADEC Engine Control ECUSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ceramic-PCB & connector supplier → Thick-Film Ceramic Screen (926 s) → Vapor-Phase Reflow & Wash (1,054 s) → Elastomeric Shock Isolator (1,389 s) → Burn-In +125°C Hot Soak (900 s) → Full Engine Sim MIL-Bus ATE (823 s) → Turbofan Fan Case Mount.SUPPLIERCeramic-PCB &connectorsupplierI1.50 d1Thick-FilmCeramic ScreenC/T 926 sI1.60 d2Vapor-PhaseReflow & WashC/T 1,054 sI2.40 d3Elastomeric ShockIsolatorC/T 1,389 sI1.10 d4Burn-In +125°CHot SoakC/T 900 sI0.90 d5Full Engine SimMIL-Bus ATEC/T 823 sI1.50 dCUSTOMERTurbofan FanCase Mount42 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Thick-Film Ceramic Screen926 s35 min94%98.2%3463 (1.50 d)51
2. Vapor-Phase Reflow & Wash1,054 s15 min92%96.8%2167 (1.60 d)44
3. Elastomeric Shock Isolator1,389 s45 min85%93.8%42101 (2.40 d)29
4. Burn-In +125°C Hot Soak900 s20 min95%98.5%1746 (1.10 d)53
5. Full Engine Sim MIL-Bus ATE823 s12 min96%99.1%1138 (0.90 d)59

Key figures

Takt time
1,286 s
Lead time
9.09 d
Value-added time
5,092 s
Process cycle efficiency (PCE)
1.0%
Rolled throughput yield (RTY)
87.0%
Customer demand per day
42 units
Line capacity per day
29 units
Bottleneck
Elastomeric Shock Isolator

Reading the bottleneck

The bottleneck is "Elastomeric Shock Isolator": it can process 29 units per day against a demand of 42 units, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 1,389 s to 1,742 s, against a takt of 1,286 s. The largest loss at this step is equipment downtime (uptime 85%), about 245 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics