Ring-Laser Gyroscope Inertial Reference IRU

Product family: Navigation IMU Modules.

Flow: Ultra-low-expansion glass supplier → Low-Expansion Optical Polish → Mirror Coat & Helium Fill → PZT Dither & Cathode Seal → Centrifuge Bias Calibration → Temp-Ramp -55/+70°C Drift → Cockpit E&E Avionics Rack

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ring-Laser Gyroscope Inertial Reference IRUSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ultra-low-expansion glass supplier → Low-Expansion Optical Polish (648 s) → Mirror Coat & Helium Fill (738 s) → PZT Dither & Cathode Seal (972 s) → Centrifuge Bias Calibration (630 s) → Temp-Ramp -55/+70°C Drift (576 s) → Cockpit E&E Avionics Rack.SUPPLIERUltra-low-expansionglass supplierI1.50 d1Low-ExpansionOptical PolishC/T 648 sI1.60 d2Mirror Coat &Helium FillC/T 738 sI2.40 d3PZT Dither &Cathode SealC/T 972 sI1.10 d4Centrifuge BiasCalibrationC/T 630 sI0.90 d5Temp-Ramp-55/+70°C DriftC/T 576 sI1.50 dCUSTOMERCockpit E&EAvionics Rack30 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Low-Expansion Optical Polish648 s35 min94%98.2%2445 (1.50 d)35
2. Mirror Coat & Helium Fill738 s15 min92%96.8%1548 (1.60 d)30
3. PZT Dither & Cathode Seal972 s45 min85%93.8%3072 (2.40 d)20
4. Centrifuge Bias Calibration630 s20 min95%98.5%1233 (1.10 d)36
5. Temp-Ramp -55/+70°C Drift576 s12 min96%99.1%827 (0.90 d)40

Key figures

Takt time
900 s
Lead time
9.13 d
Value-added time
3,564 s
Process cycle efficiency (PCE)
1.4%
Rolled throughput yield (RTY)
87.0%
Customer demand per day
30 units
Line capacity per day
20 units
Bottleneck
PZT Dither & Cathode Seal

Reading the bottleneck

The bottleneck is "PZT Dither & Cathode Seal": it can process 20 units per day against a demand of 30 units, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 972 s to 1,219 s, against a takt of 900 s. The largest loss at this step is equipment downtime (uptime 85%), about 172 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.