15-Inch Synthetic Vision Cockpit LCD/OLED
Product family: NVG-Compatible Primary Displays.
Flow: Anti-reflective glass supplier → Index-Matched Optical Bond → Night-Vision NVIS Filter Seal → Dual Backlight Driver Mate → Rapid Decompression Bench → Luminance Uniformity & CIE → Airframer Flight Deck
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Index-Matched Optical Bond | 353 s | 35 min | 94% | 98.2% | 44 | 83 (1.51 d) | 64 |
| 2. Night-Vision NVIS Filter Seal | 403 s | 15 min | 92% | 96.8% | 28 | 88 (1.60 d) | 56 |
| 3. Dual Backlight Driver Mate | 530 s | 45 min | 85% | 93.8% | 55 | 132 (2.40 d) | 37 |
| 4. Rapid Decompression Bench | 344 s | 20 min | 95% | 98.5% | 22 | 61 (1.11 d) | 65 |
| 5. Luminance Uniformity & CIE | 314 s | 12 min | 96% | 99.1% | 14 | 50 (0.91 d) | 73 |
Key figures
- Takt time
- 491 s
- Lead time
- 9.11 d
- Value-added time
- 1,944 s
- Process cycle efficiency (PCE)
- 0.79%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 55 units
- Line capacity per day
- 37 units
- Bottleneck
- Dual Backlight Driver Mate
Reading the bottleneck
The bottleneck is "Dual Backlight Driver Mate": it can process 37 units per day against a demand of 55 units, so it falls short of demand by 33.5%. Once downtime and scrap are counted, its cycle time grows from 530 s to 665 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 85%), about 93.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Triple-Redundant Flight Control Computer
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Ka-Band LEO Satellite Payload Transponder
- Crash-Survivable Flight Data & CVR Recorder
- Smart Heated Pitot-Static Air Data Probe
- Bipolar Full-Spectrum Mood Cabin Lighting
- 5G-Immune Radar Altimeter LRUs
- Encrypted Beyond-Line-of-Sight UAV Modem