Smart Heated Pitot-Static Air Data Probe

Product family: Multi-Function Mach Probes.

Flow: Nickel-alloy & seamless tube → Nickel-Alloy Swage & Brazing → Mineral-Insulated Heater Fit → Air-Data Pressure Transducer → Icing Wind-Tunnel Batch Test → Zero-Drift Baro Calibration → Nose Fuselage Station

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Smart Heated Pitot-Static Air Data ProbeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nickel-alloy & seamless tube → Nickel-Alloy Swage & Brazing (353 s) → Mineral-Insulated Heater Fit (403 s) → Air-Data Pressure Transducer (530 s) → Icing Wind-Tunnel Batch Test (344 s) → Zero-Drift Baro Calibration (314 s) → Nose Fuselage Station.SUPPLIERNickel-alloy &seamless tubeI1.50 d1Nickel-AlloySwage & BrazingC/T 353 sI1.60 d2Mineral-InsulatedHeater FitC/T 403 sI2.40 d3Air-Data PressureTransducerC/T 530 sI1.10 d4Icing Wind-TunnelBatch TestC/T 344 sI0.90 d5Zero-Drift BaroCalibrationC/T 314 sI1.50 dCUSTOMERNose FuselageStation110 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nickel-Alloy Swage & Brazing353 s35 min94%98.2%88165 (1.50 d)134
2. Mineral-Insulated Heater Fit403 s15 min92%96.8%55176 (1.60 d)115
3. Air-Data Pressure Transducer530 s45 min85%93.8%110264 (2.40 d)77
4. Icing Wind-Tunnel Batch Test344 s20 min95%98.5%44121 (1.10 d)139
5. Zero-Drift Baro Calibration314 s12 min96%99.1%2899 (0.90 d)155

Key figures

Takt time
491 s
Lead time
9.04 d
Value-added time
1,944 s
Process cycle efficiency (PCE)
0.40%
Rolled throughput yield (RTY)
87.0%
Customer demand per day
110 units
Line capacity per day
77 units
Bottleneck
Air-Data Pressure Transducer

Reading the bottleneck

The bottleneck is "Air-Data Pressure Transducer": it can process 77 units per day against a demand of 110 units, so it falls short of demand by 29.8%. Once downtime and scrap are counted, its cycle time grows from 530 s to 665 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 85%), about 93.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.