Crash-Survivable Flight Data & CVR Recorder
Product family: 25-Hr Solid-State Black Boxes.
Flow: Titanium Armor Shells → NAND Memory Board SMT → Fire-Proof Ceramic-Fiber Potted Box → Titanium Armor Shell Weld → Acoustic Beacon & Paint → 1100°C Torch Audit Lot → Tail Section Avionics
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. NAND Memory Board SMT | 598 s | 35 min | 94% | 98.2% | 52 | 98 (1.51 d) | 79 |
| 2. Fire-Proof Ceramic-Fiber Potted Box | 681 s | 15 min | 92% | 96.8% | 33 | 104 (1.60 d) | 68 |
| 3. Titanium Armor Shell Weld | 897 s | 45 min | 85% | 93.8% | 65 | 156 (2.40 d) | 46 |
| 4. Acoustic Beacon & Paint | 582 s | 20 min | 95% | 98.5% | 26 | 72 (1.11 d) | 82 |
| 5. 1100°C Torch Audit Lot | 532 s | 12 min | 96% | 99.1% | 16 | 59 (0.91 d) | 91 |
Key figures
- Takt time
- 831 s
- Lead time
- 9.09 d
- Value-added time
- 3,290 s
- Process cycle efficiency (PCE)
- 0.67%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 65 units
- Line capacity per day
- 46 units
- Bottleneck
- Titanium Armor Shell Weld
Reading the bottleneck
The bottleneck is "Titanium Armor Shell Weld": it can process 46 units per day against a demand of 65 units, so it falls short of demand by 29.8%. Once downtime and scrap are counted, its cycle time grows from 897 s to 1,125 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 85%), about 158 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Triple-Redundant Flight Control Computer
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- 15-Inch Synthetic Vision Cockpit LCD/OLED
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Ka-Band LEO Satellite Payload Transponder
- Smart Heated Pitot-Static Air Data Probe
- Bipolar Full-Spectrum Mood Cabin Lighting
- 5G-Immune Radar Altimeter LRUs
- Encrypted Beyond-Line-of-Sight UAV Modem