Full-Fuselage PTFE Aerospace Cable Harness

Product family: 200-Branch Formboard Looms.

Flow: Aerospace cable supplier → UV Laser Wire Marking → Braiding & Aramid Chafe Wrap → Mil-38999 Crimp & Back-Shell → EMI Shield Terminator Shrink → 1500V Hipot & Pin-to-Pin → Final Aircraft Wiring Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Full-Fuselage PTFE Aerospace Cable HarnessSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aerospace cable supplier → UV Laser Wire Marking (1,389 s) → Braiding & Aramid Chafe Wrap (1,581 s) → Mil-38999 Crimp & Back-Shell (2,083 s) → EMI Shield Terminator Shrink (1,350 s) → 1500V Hipot & Pin-to-Pin (1,234 s) → Final Aircraft Wiring Line.SUPPLIERAerospace cablesupplierI1.50 d1UV Laser WireMarkingC/T 1,389 sI1.61 d2Braiding & AramidChafe WrapC/T 1,581 sI2.39 d3Mil-38999 Crimp &Back-ShellC/T 2,083 sI1.11 d4EMI ShieldTerminator ShrinkC/T 1,350 sI0.89 d51500V Hipot &Pin-to-PinC/T 1,234 sI1.50 dCUSTOMERFinal AircraftWiring Line28 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. UV Laser Wire Marking1,389 s35 min94%98.2%2242 (1.50 d)34
2. Braiding & Aramid Chafe Wrap1,581 s15 min92%96.8%1445 (1.61 d)29
3. Mil-38999 Crimp & Back-Shell2,083 s45 min85%93.8%2867 (2.39 d)20
4. EMI Shield Terminator Shrink1,350 s20 min95%98.5%1131 (1.11 d)35
5. 1500V Hipot & Pin-to-Pin1,234 s12 min96%99.1%725 (0.89 d)39

Key figures

Takt time
1,929 s
Lead time
9.14 d
Value-added time
7,637 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
87.0%
Customer demand per day
28 assemblies
Line capacity per day
20 assemblies
Bottleneck
Mil-38999 Crimp & Back-Shell

Reading the bottleneck

The bottleneck is "Mil-38999 Crimp & Back-Shell": it can process 20 assemblies per day against a demand of 28 assemblies, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,613 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 85%), about 368 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics