Bipolar Full-Spectrum Mood Cabin Lighting
Product family: CAN-Bus Aircraft Light Strips.
Flow: Automotive LED supplier → Metal-Core PCB SMT & Reflow → Silicone Extruded Lens Fit → DALI / ARINC Address Flash → Flammability FAR 25.853 Test → 24h Luminance Burn-In → Cabin Completion Shop
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Metal-Core PCB SMT & Reflow | 93.0 s | 35 min | 94% | 98.2% | 336 | 630 (1.50 d) | 510 |
| 2. Silicone Extruded Lens Fit | 105 s | 15 min | 92% | 96.8% | 210 | 672 (1.60 d) | 443 |
| 3. DALI / ARINC Address Flash | 139 s | 45 min | 85% | 93.8% | 420 | 1,008 (2.40 d) | 294 |
| 4. Flammability FAR 25.853 Test | 90.0 s | 20 min | 95% | 98.5% | 168 | 462 (1.10 d) | 530 |
| 5. 24h Luminance Burn-In | 82.0 s | 12 min | 96% | 99.1% | 105 | 378 (0.90 d) | 593 |
Key figures
- Takt time
- 129 s
- Lead time
- 9.01 d
- Value-added time
- 509 s
- Process cycle efficiency (PCE)
- 0.10%
- Rolled throughput yield (RTY)
- 87.0%
- Customer demand per day
- 420 units
- Line capacity per day
- 294 units
- Bottleneck
- DALI / ARINC Address Flash
Reading the bottleneck
The bottleneck is "DALI / ARINC Address Flash": it can process 294 units per day against a demand of 420 units, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 139 s to 174 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 85%), about 24.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Avionics, Space & Flight Electronics: Avionics, Space & Flight Electronics
- Triple-Redundant Flight Control Computer
- Ring-Laser Gyroscope Inertial Reference IRU
- AESA Airborne Phased-Array Radar Antenna
- 15-Inch Synthetic Vision Cockpit LCD/OLED
- Dual-Channel FADEC Engine Control ECU
- Full-Fuselage PTFE Aerospace Cable Harness
- Ka-Band LEO Satellite Payload Transponder
- Crash-Survivable Flight Data & CVR Recorder
- Smart Heated Pitot-Static Air Data Probe
- 5G-Immune Radar Altimeter LRUs
- Encrypted Beyond-Line-of-Sight UAV Modem