Acoustic Carbon Cascade Thrust Reverser

Product family: Transcowl Reverser Halves.

Flow: Carbon prepreg supplier → Laser Acoustic Hole Micro-Drill → Honeycomb Pre-Cure Bond → Titan Actuator Frame Mate → Thermal Anti-Ice Seal → Full-Stroke Hydraulic Test → Nacelle Final Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Acoustic Carbon Cascade Thrust ReverserSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Carbon prepreg supplier → Laser Acoustic Hole Micro-Drill (1,595 s) → Honeycomb Pre-Cure Bond (2,062 s) → Titan Actuator Frame Mate (2,651 s) → Thermal Anti-Ice Seal (1,816 s) → Full-Stroke Hydraulic Test (1,669 s) → Nacelle Final Line.SUPPLIERCarbon prepregsupplierI1.59 d1Laser AcousticHole Micro-DrillC/T 1,595 sI2.00 d2HoneycombPre-Cure BondC/T 2,062 sI2.59 d3Titan ActuatorFrame MateC/T 2,651 sI1.32 d4Thermal Anti-IceSealC/T 1,816 sI1.09 d5Full-StrokeHydraulic TestC/T 1,669 sI1.50 dCUSTOMERNacelle FinalLine22 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Acoustic Hole Micro-Drill1,595 s20 min95%99.0%2235 (1.59 d)31
2. Honeycomb Pre-Cure Bond2,062 s45 min90%97.2%1844 (2.00 d)22
3. Titan Actuator Frame Mate2,651 s60 min84%94.8%3357 (2.59 d)15
4. Thermal Anti-Ice Seal1,816 s25 min93%97.8%1129 (1.32 d)26
5. Full-Stroke Hydraulic Test1,669 s15 min95%96.8%1124 (1.09 d)29

Key figures

Takt time
2,455 s
Lead time
10.3 d
Value-added time
9,793 s
Process cycle efficiency (PCE)
1.8%
Rolled throughput yield (RTY)
86.4%
Customer demand per day
22 units
Line capacity per day
15 units
Bottleneck
Titan Actuator Frame Mate

Reading the bottleneck

The bottleneck is "Titan Actuator Frame Mate": it can process 15 units per day against a demand of 22 units, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 2,651 s to 3,329 s, against a takt of 2,455 s. The largest loss at this step is equipment downtime (uptime 84%), about 505 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.