Carbon Monocoque MALE UAV Airframe

Product family: Long-Endurance Drone Fuselage.

Flow: Carbon prepreg supplier → CNC Cut Ply Book Kits → Out-of-Autoclave Oven Cure → Structural Adhesive Join → Payload Hardpoint Jig → 3G Proof Load & Mass QC → Defense UAV Final Hangar

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Carbon Monocoque MALE UAV AirframeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Carbon prepreg supplier → CNC Cut Ply Book Kits (1,254 s) → Out-of-Autoclave Oven Cure (1,620 s) → Structural Adhesive Join (2,083 s) → Payload Hardpoint Jig (1,427 s) → 3G Proof Load & Mass QC (1,311 s) → Defense UAV Final Hangar.SUPPLIERCarbon prepregsupplierI1.57 d1CNC Cut Ply BookKitsC/T 1,254 sI2.00 d2Out-of-AutoclaveOven CureC/T 1,620 sI2.57 d3StructuralAdhesive JoinC/T 2,083 sI1.29 d4Payload HardpointJigC/T 1,427 sI1.07 d53G Proof Load &Mass QCC/T 1,311 sI1.50 dCUSTOMERDefense UAVFinal Hangar14 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CNC Cut Ply Book Kits1,254 s20 min95%99.0%1422 (1.57 d)19
2. Out-of-Autoclave Oven Cure1,620 s45 min90%97.2%1128 (2.00 d)13
3. Structural Adhesive Join2,083 s60 min84%94.8%2136 (2.57 d)9
4. Payload Hardpoint Jig1,427 s25 min93%97.8%718 (1.29 d)15
5. 3G Proof Load & Mass QC1,311 s15 min95%96.8%715 (1.07 d)18

Key figures

Takt time
1,929 s
Lead time
10.3 d
Value-added time
7,695 s
Process cycle efficiency (PCE)
2.8%
Rolled throughput yield (RTY)
86.4%
Customer demand per day
14 units
Line capacity per day
9 units
Bottleneck
Structural Adhesive Join

Reading the bottleneck

The bottleneck is "Structural Adhesive Join": it can process 9 units per day against a demand of 14 units, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,616 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Carbon Composites & Autoclave: Carbon Composites & Autoclave