Composite Upper/Lower Wing Skin Panel

Product family: 32m Carbon Wing Covers.

Flow: Carbon tow supplier → CNC Ultrasonic Ply Table → Dual-Head ATL Gantry Layup → Double Vacuum Debulk Bag → 6-Bar Autoclave Cycle → Waterjet & TTU Water-Squirter → Wing Box Final Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Composite Upper/Lower Wing Skin PanelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Carbon tow supplier → CNC Ultrasonic Ply Table (6,581 s) → Dual-Head ATL Gantry Layup (8,505 s) → Double Vacuum Debulk Bag (10,935 s) → 6-Bar Autoclave Cycle (7,493 s) → Waterjet & TTU Water-Squirter (6,885 s) → Wing Box Final Assembly.SUPPLIERCarbon towsupplierI1.63 d1CNC UltrasonicPly TableC/T 6,581 sI2.00 d2Dual-Head ATLGantry LayupC/T 8,505 sI2.63 d3Double VacuumDebulk BagC/T 10,935 sI1.25 d46-Bar AutoclaveCycleC/T 7,493 sI1.13 d5Waterjet & TTUWater-SquirterC/T 6,885 sI1.50 dCUSTOMERWing Box FinalAssembly8 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CNC Ultrasonic Ply Table6,581 s20 min95%99.0%813 (1.63 d)11
2. Dual-Head ATL Gantry Layup8,505 s45 min90%97.2%616 (2.00 d)8
3. Double Vacuum Debulk Bag10,935 s60 min84%94.8%1221 (2.63 d)6
4. 6-Bar Autoclave Cycle7,493 s25 min93%97.8%410 (1.25 d)9
5. Waterjet & TTU Water-Squirter6,885 s15 min95%96.8%49 (1.13 d)11

Key figures

Takt time
10,125 s
Lead time
10.6 d
Value-added time
40,399 s
Process cycle efficiency (PCE)
4.7%
Rolled throughput yield (RTY)
86.4%
Customer demand per day
8 parts
Line capacity per day
6 parts
Bottleneck
Double Vacuum Debulk Bag

Reading the bottleneck

The bottleneck is "Double Vacuum Debulk Bag": it can process 6 parts per day against a demand of 8 parts, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 10,935 s to 13,732 s, against a takt of 10,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 2,083 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.