Composite Glass/Carbon Helicopter Rotor Blade

Product family: Main Lift Airfoil Blades.

Flow: Glass prepreg supplier → Automated Filament Spar Wind → Aramid Core Mill & Foam → Matched Clamshell Heated Press → Electroformed Nickel Erosion Edge → Static/Dynamic Span Balance → Rotorcraft Delivery Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Composite Glass/Carbon Helicopter Rotor BladeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Glass prepreg supplier → Automated Filament Spar Wind (1,950 s) → Aramid Core Mill & Foam (2,520 s) → Matched Clamshell Heated Press (3,240 s) → Electroformed Nickel Erosion Edge (2,220 s) → Static/Dynamic Span Balance (2,040 s) → Rotorcraft Delivery Line.SUPPLIERGlass prepregsupplierI1.61 d1AutomatedFilament Spar…C/T 1,950 sI2.00 d2Aramid Core Mill& FoamC/T 2,520 sI2.61 d3Matched ClamshellHeated PressC/T 3,240 sI1.28 d4ElectroformedNickel Erosion…C/T 2,220 sI1.11 d5Static/DynamicSpan BalanceC/T 2,040 sI1.50 dCUSTOMERRotorcraftDelivery Line18 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Automated Filament Spar Wind1,950 s20 min95%99.0%1829 (1.61 d)25
2. Aramid Core Mill & Foam2,520 s45 min90%97.2%1436 (2.00 d)18
3. Matched Clamshell Heated Press3,240 s60 min84%94.8%2747 (2.61 d)13
4. Electroformed Nickel Erosion Edge2,220 s25 min93%97.8%923 (1.28 d)21
5. Static/Dynamic Span Balance2,040 s15 min95%96.8%920 (1.11 d)24

Key figures

Takt time
3,000 s
Lead time
10.3 d
Value-added time
11,970 s
Process cycle efficiency (PCE)
2.1%
Rolled throughput yield (RTY)
86.4%
Customer demand per day
18 parts
Line capacity per day
13 parts
Bottleneck
Matched Clamshell Heated Press

Reading the bottleneck

The bottleneck is "Matched Clamshell Heated Press": it can process 13 parts per day against a demand of 18 parts, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 3,240 s to 4,069 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 617 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.