Sub-Safe Nickel-Aluminum-Bronze Hull Valve

Product family: Deep-Dive Seawater Valves.

Flow: Nickel-aluminum-bronze supplier → 100% Radiography Casting QC → CNC Globe Seat & Bonnet Bore → Cobalt-Alloy Seat Lap & Stem Fit → Shock-Grade 901D Nail Test → SUBSAFE Certified Doc Trace → Naval Nuclear Yards

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sub-Safe Nickel-Aluminum-Bronze Hull ValveSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nickel-aluminum-bronze supplier → 100% Radiography Casting QC (765 s) → CNC Globe Seat & Bonnet Bore (945 s) → Cobalt-Alloy Seat Lap & Stem Fit (1,204 s) → Shock-Grade 901D Nail Test (878 s) → SUBSAFE Certified Doc Trace (653 s) → Naval Nuclear Yards.SUPPLIERNickel-aluminum-bronzesupplierI2.00 d1100% RadiographyCasting QCC/T 765 sI1.79 d2CNC Globe Seat &Bonnet BoreC/T 945 sI2.50 d3Cobalt-Alloy SeatLap & Stem FitC/T 1,204 sI1.42 d4Shock-Grade 901DNail TestC/T 878 sI0.79 d5SUBSAFE CertifiedDoc TraceC/T 653 sI1.50 dCUSTOMERNaval NuclearYards24 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 100% Radiography Casting QC765 s35 min95%99.0%3648 (2.00 d)31
2. CNC Globe Seat & Bonnet Bore945 s30 min91%96.5%1943 (1.79 d)23
3. Cobalt-Alloy Seat Lap & Stem Fit1,204 s45 min84%94.8%2460 (2.50 d)16
4. Shock-Grade 901D Nail Test878 s25 min92%97.6%1934 (1.42 d)26
5. SUBSAFE Certified Doc Trace653 s10 min97%99.2%619 (0.79 d)36

Key figures

Takt time
1,125 s
Lead time
10.2 d
Value-added time
4,445 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
87.7%
Customer demand per day
24 units
Line capacity per day
16 units
Bottleneck
Cobalt-Alloy Seat Lap & Stem Fit

Reading the bottleneck

The bottleneck is "Cobalt-Alloy Seat Lap & Stem Fit": it can process 16 units per day against a demand of 24 units, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,512 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 229 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.