MIL-STD Software-Defined Tactical Manpack

Product family: Frequency-Hopping Field Radios.

Flow: RF module & Al casting supplier → Precision RF Deck SMT → Laser-Etched Milled Chassis → NSA Type-1 Crypto Fill → Water Immersion 2m Pressure → ECCM Hopping Range Check → Allied Ground Forces

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: MIL-STD Software-Defined Tactical ManpackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. RF module & Al casting supplier → Precision RF Deck SMT (387 s) → Laser-Etched Milled Chassis (477 s) → NSA Type-1 Crypto Fill (608 s) → Water Immersion 2m Pressure (443 s) → ECCM Hopping Range Check (330 s) → Allied Ground Forces.SUPPLIERRF module & AlcastingsupplierI2.00 d1Precision RF DeckSMTC/T 387 sI1.80 d2Laser-EtchedMilled ChassisC/T 477 sI2.51 d3NSA Type-1 CryptoFillC/T 608 sI1.40 d4Water Immersion2m PressureC/T 443 sI0.80 d5ECCM HoppingRange CheckC/T 330 sI1.51 dCUSTOMERAllied GroundForces95 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Precision RF Deck SMT387 s35 min95%99.0%143190 (2.00 d)128
2. Laser-Etched Milled Chassis477 s30 min91%96.5%76171 (1.80 d)95
3. NSA Type-1 Crypto Fill608 s45 min84%94.8%95238 (2.51 d)67
4. Water Immersion 2m Pressure443 s25 min92%97.6%76133 (1.40 d)106
5. ECCM Hopping Range Check330 s10 min97%99.2%2476 (0.80 d)151

Key figures

Takt time
568 s
Lead time
10.1 d
Value-added time
2,245 s
Process cycle efficiency (PCE)
0.41%
Rolled throughput yield (RTY)
87.7%
Customer demand per day
95 units
Line capacity per day
67 units
Bottleneck
NSA Type-1 Crypto Fill

Reading the bottleneck

The bottleneck is "NSA Type-1 Crypto Fill": it can process 67 units per day against a demand of 95 units, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 608 s to 764 s, against a takt of 568 s. The largest loss at this step is equipment downtime (uptime 84%), about 116 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.