Tactical Interceptor Electromechanical Fin Kit
Product family: High-G Servo Actuator Tail Rings.
Flow: Brushless motor & Ti casting supplier → Ring Forging 5-Axis Mill → Zero-Backlash Ball-Screw Fit → Thermal Battery Housing Mate → Rapid Burn-In Step Response → X-Ray Arm-Safe Interlock → Prime Defense Integrators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Ring Forging 5-Axis Mill | 459 s | 35 min | 95% | 99.0% | 120 | 160 (2.00 d) | 108 |
| 2. Zero-Backlash Ball-Screw Fit | 567 s | 30 min | 91% | 96.5% | 64 | 144 (1.80 d) | 80 |
| 3. Thermal Battery Housing Mate | 722 s | 45 min | 84% | 94.8% | 80 | 200 (2.50 d) | 57 |
| 4. Rapid Burn-In Step Response | 527 s | 25 min | 92% | 97.6% | 64 | 112 (1.40 d) | 89 |
| 5. X-Ray Arm-Safe Interlock | 392 s | 10 min | 97% | 99.2% | 20 | 64 (0.80 d) | 127 |
Key figures
- Takt time
- 675 s
- Lead time
- 10.0 d
- Value-added time
- 2,667 s
- Process cycle efficiency (PCE)
- 0.49%
- Rolled throughput yield (RTY)
- 87.7%
- Customer demand per day
- 80 assemblies
- Line capacity per day
- 57 assemblies
- Bottleneck
- Thermal Battery Housing Mate
Reading the bottleneck
The bottleneck is "Thermal Battery Housing Mate": it can process 57 assemblies per day against a demand of 80 assemblies, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 722 s to 907 s, against a takt of 675 s. The largest loss at this step is equipment downtime (uptime 84%), about 138 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Defense, Naval & Optronics Systems: Defense, Naval & Optronics Systems
- Submarine Acoustic Composite Bow Sonar Dome
- Unmanned 30mm Armored Vehicle Gun Turret
- VPX Conduction-Cooled Tactical Edge Server
- Airborne Multi-Spectral EOTS Targeting Pod
- Gen-3 Quad-Tube Night Vision Goggle Binocular
- Level-IV Silicon Carbide Ballistic Armor Plate
- 42-Meter Hollow Marine Propulsion Shaft Line
- Sub-Safe Nickel-Aluminum-Bronze Hull Valve
- S-Band Naval Solid-State Phased Radar Mast
- Autonomous Unmanned Surface Patrol Craft
- MIL-STD Software-Defined Tactical Manpack