Gen-3 Quad-Tube Night Vision Goggle Binocular

Product family: High-FOM Tactical NVGs.

Flow: Image-intensifier tube supplier → PEI Housing Mold & Coat → Collimated Objective Match → IIT Cleanroom Drop-In → Nitrogen Purge & Humidity Bake → Diopter, Halo & Resolution Bench → Infantry Equipment Contracts

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Gen-3 Quad-Tube Night Vision Goggle BinocularSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Image-intensifier tube supplier → PEI Housing Mold & Coat (282 s) → Collimated Objective Match (349 s) → IIT Cleanroom Drop-In (444 s) → Nitrogen Purge & Humidity Bake (324 s) → Diopter, Halo & Resolution Bench (241 s) → Infantry Equipment Contracts.SUPPLIERImage-intensifiertube supplierI2.00 d1PEI Housing Mold& CoatC/T 282 sI1.80 d2CollimatedObjective MatchC/T 349 sI2.51 d3IIT CleanroomDrop-InC/T 444 sI1.40 d4Nitrogen Purge &Humidity BakeC/T 324 sI0.80 d5Diopter, Halo &Resolution BenchC/T 241 sI1.51 dCUSTOMERInfantryEquipment…65 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. PEI Housing Mold & Coat282 s35 min95%99.0%98130 (2.00 d)85
2. Collimated Objective Match349 s30 min91%96.5%52117 (1.80 d)62
3. IIT Cleanroom Drop-In444 s45 min84%94.8%65163 (2.51 d)44
4. Nitrogen Purge & Humidity Bake324 s25 min92%97.6%5291 (1.40 d)70
5. Diopter, Halo & Resolution Bench241 s10 min97%99.2%1652 (0.80 d)98

Key figures

Takt time
415 s
Lead time
10.1 d
Value-added time
1,640 s
Process cycle efficiency (PCE)
0.60%
Rolled throughput yield (RTY)
87.7%
Customer demand per day
65 units
Line capacity per day
44 units
Bottleneck
IIT Cleanroom Drop-In

Reading the bottleneck

The bottleneck is "IIT Cleanroom Drop-In": it can process 44 units per day against a demand of 65 units, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 444 s to 558 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 84%), about 84.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Defense, Naval & Optronics Systems: Defense, Naval & Optronics Systems