S-Band Naval Solid-State Phased Radar Mast

Product family: Shipboard Air-Defense Radars.

Flow: Phased-array module supplier → Al Alloy Structural Pedestal → T/R Module Array Backplane → Dielectric Coolant Flush → Rotary Joint RF Slip-Ring Test → Far-Field Maritime Pattern → Destroyer Integration Yard

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: S-Band Naval Solid-State Phased Radar MastSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Phased-array module supplier → Al Alloy Structural Pedestal (4,590 s) → T/R Module Array Backplane (5,670 s) → Dielectric Coolant Flush (7,223 s) → Rotary Joint RF Slip-Ring Test (5,265 s) → Far-Field Maritime Pattern (3,915 s) → Destroyer Integration Yard.SUPPLIERPhased-arraymodule supplierI2.00 d1Al AlloyStructural…C/T 4,590 sI1.75 d2T/R Module ArrayBackplaneC/T 5,670 sI2.50 d3DielectricCoolant FlushC/T 7,223 sI1.50 d4Rotary Joint RFSlip-Ring TestC/T 5,265 sI0.75 d5Far-FieldMaritime PatternC/T 3,915 sI1.50 dCUSTOMERDestroyerIntegration…4 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Al Alloy Structural Pedestal4,590 s35 min95%99.0%68 (2.00 d)5
2. T/R Module Array Backplane5,670 s30 min91%96.5%37 (1.75 d)4
3. Dielectric Coolant Flush7,223 s45 min84%94.8%410 (2.50 d)3
4. Rotary Joint RF Slip-Ring Test5,265 s25 min92%97.6%36 (1.50 d)4
5. Far-Field Maritime Pattern3,915 s10 min97%99.2%13 (0.75 d)6

Key figures

Takt time
6,750 s
Lead time
11.0 d
Value-added time
26,663 s
Process cycle efficiency (PCE)
9.0%
Rolled throughput yield (RTY)
87.7%
Customer demand per day
4 units
Line capacity per day
3 units
Bottleneck
Dielectric Coolant Flush

Reading the bottleneck

The bottleneck is "Dielectric Coolant Flush": it can process 3 units per day against a demand of 4 units, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 9,070 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,376 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Defense, Naval & Optronics Systems: Defense, Naval & Optronics Systems