Airborne Multi-Spectral EOTS Targeting Pod
Product family: MWIR + Laser Designator Pods.
Flow: Cooled infrared detector supplier → Precision Ball Gimbal Build → ZnS Infrared Optics Align → Laser Rangefinder Bore-Sight → Dry N2 Purge & Backfill → MIL Environmental & Track QC → Defense Flight Line
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Precision Ball Gimbal Build | 1,530 s | 35 min | 95% | 99.0% | 18 | 24 (2.00 d) | 16 |
| 2. ZnS Infrared Optics Align | 1,890 s | 30 min | 91% | 96.5% | 10 | 22 (1.83 d) | 12 |
| 3. Laser Rangefinder Bore-Sight | 2,408 s | 45 min | 84% | 94.8% | 12 | 30 (2.50 d) | 8 |
| 4. Dry N2 Purge & Backfill | 1,755 s | 25 min | 92% | 97.6% | 10 | 17 (1.42 d) | 13 |
| 5. MIL Environmental & Track QC | 1,305 s | 10 min | 97% | 99.2% | 3 | 10 (0.83 d) | 18 |
Key figures
- Takt time
- 2,250 s
- Lead time
- 10.4 d
- Value-added time
- 8,888 s
- Process cycle efficiency (PCE)
- 3.2%
- Rolled throughput yield (RTY)
- 87.7%
- Customer demand per day
- 12 units
- Line capacity per day
- 8 units
- Bottleneck
- Laser Rangefinder Bore-Sight
Reading the bottleneck
The bottleneck is "Laser Rangefinder Bore-Sight": it can process 8 units per day against a demand of 12 units, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 2,408 s to 3,024 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 84%), about 459 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Defense, Naval & Optronics Systems: Defense, Naval & Optronics Systems
- Submarine Acoustic Composite Bow Sonar Dome
- Unmanned 30mm Armored Vehicle Gun Turret
- VPX Conduction-Cooled Tactical Edge Server
- Gen-3 Quad-Tube Night Vision Goggle Binocular
- Level-IV Silicon Carbide Ballistic Armor Plate
- 42-Meter Hollow Marine Propulsion Shaft Line
- Sub-Safe Nickel-Aluminum-Bronze Hull Valve
- Tactical Interceptor Electromechanical Fin Kit
- S-Band Naval Solid-State Phased Radar Mast
- Autonomous Unmanned Surface Patrol Craft
- MIL-STD Software-Defined Tactical Manpack