VPX Conduction-Cooled Tactical Edge Server

Product family: MIL-810H Field Compute Nodes.

Flow: Rugged-computer supplier → Milled Monoblock Al Case → Wedge-Lock Card Stack Fit → Thermal Pad & Conduction Seal → MIL-810H Shock & EMI Sweep → FIPS Crypto Boot Cert → C4ISR Defense Integrators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: VPX Conduction-Cooled Tactical Edge ServerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Rugged-computer supplier → Milled Monoblock Al Case (525 s) → Wedge-Lock Card Stack Fit (648 s) → Thermal Pad & Conduction Seal (825 s) → MIL-810H Shock & EMI Sweep (602 s) → FIPS Crypto Boot Cert (447 s) → C4ISR Defense Integrators.SUPPLIERRugged-computersupplierI2.00 d1Milled MonoblockAl CaseC/T 525 sI1.80 d2Wedge-Lock CardStack FitC/T 648 sI2.51 d3Thermal Pad &Conduction SealC/T 825 sI1.40 d4MIL-810H Shock &EMI SweepC/T 602 sI0.80 d5FIPS Crypto BootCertC/T 447 sI1.51 dCUSTOMERC4ISR DefenseIntegrators35 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Milled Monoblock Al Case525 s35 min95%99.0%5370 (2.00 d)46
2. Wedge-Lock Card Stack Fit648 s30 min91%96.5%2863 (1.80 d)34
3. Thermal Pad & Conduction Seal825 s45 min84%94.8%3588 (2.51 d)23
4. MIL-810H Shock & EMI Sweep602 s25 min92%97.6%2849 (1.40 d)37
5. FIPS Crypto Boot Cert447 s10 min97%99.2%928 (0.80 d)53

Key figures

Takt time
771 s
Lead time
10.1 d
Value-added time
3,047 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
87.7%
Customer demand per day
35 units
Line capacity per day
23 units
Bottleneck
Thermal Pad & Conduction Seal

Reading the bottleneck

The bottleneck is "Thermal Pad & Conduction Seal": it can process 23 units per day against a demand of 35 units, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 825 s to 1,036 s, against a takt of 771 s. The largest loss at this step is equipment downtime (uptime 84%), about 157 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Defense, Naval & Optronics Systems: Defense, Naval & Optronics Systems