Additive-Printed Titanium Engine Fuel Nozzle

Product family: 1-Piece LPBF Swirl Nozzles.

Flow: Titanium powder supplier → LPBF Laser Powder Bed → Wire-EDM Plate Cut & De-Powder → Abrasive Flow Channel Polish → CT-Scan Internal Lattice → Kerosene Cone Spray Rig → Combustor Dome Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Additive-Printed Titanium Engine Fuel NozzleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Titanium powder supplier → LPBF Laser Powder Bed (278 s) → Wire-EDM Plate Cut & De-Powder (324 s) → Abrasive Flow Channel Polish (417 s) → CT-Scan Internal Lattice (293 s) → Kerosene Cone Spray Rig (251 s) → Combustor Dome Assembly.SUPPLIERTitanium powdersupplierI2.50 d1LPBF Laser PowderBedC/T 278 sI2.20 d2Wire-EDM PlateCut & De-PowderC/T 324 sI2.60 d3Abrasive FlowChannel PolishC/T 417 sI1.40 d4CT-Scan InternalLatticeC/T 293 sI1.10 d5Kerosene ConeSpray RigC/T 251 sI1.50 dCUSTOMERCombustor DomeAssembly140 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. LPBF Laser Powder Bed278 s40 min92%96.4%280350 (2.50 d)168
2. Wire-EDM Plate Cut & De-Powder324 s50 min89%97.1%140308 (2.20 d)136
3. Abrasive Flow Channel Polish417 s65 min83%94.2%140364 (2.60 d)94
4. CT-Scan Internal Lattice293 s30 min92%98.0%70196 (1.40 d)155
5. Kerosene Cone Spray Rig251 s45 min94%98.8%70154 (1.10 d)180

Key figures

Takt time
386 s
Lead time
11.3 d
Value-added time
1,563 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
140 parts
Line capacity per day
94 parts
Bottleneck
Abrasive Flow Channel Polish

Reading the bottleneck

The bottleneck is "Abrasive Flow Channel Polish": it can process 94 parts per day against a demand of 140 parts, so it falls short of demand by 32.9%. Once downtime and scrap are counted, its cycle time grows from 417 s to 533 s, against a takt of 386 s. The largest loss at this step is equipment downtime (uptime 83%), about 85.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.