150kW Aircraft Auxiliary Power Unit Assembly

Product family: Tail-Cone Gas Turbine APUs.

Flow: Tier-2 castings supplier → Impeller 5-Axis Flank Mill → Combustor & Bearing Stack → Fuel Control Hydromech Fit → Starter-Generator Mate → 5-Cycle Hot-Start Test Cell → OEM Final Assembly Tail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 150kW Aircraft Auxiliary Power Unit AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Tier-2 castings supplier → Impeller 5-Axis Flank Mill (1,944 s) → Combustor & Bearing Stack (2,268 s) → Fuel Control Hydromech Fit (2,916 s) → Starter-Generator Mate (2,052 s) → 5-Cycle Hot-Start Test Cell (1,755 s) → OEM Final Assembly Tail.SUPPLIERTier-2 castingssupplierI2.50 d1Impeller 5-AxisFlank MillC/T 1,944 sI2.20 d2Combustor &Bearing StackC/T 2,268 sI2.60 d3Fuel ControlHydromech FitC/T 2,916 sI1.40 d4Starter-GeneratorMateC/T 2,052 sI1.10 d55-Cycle Hot-StartTest CellC/T 1,755 sI1.50 dCUSTOMEROEM FinalAssembly Tail20 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Impeller 5-Axis Flank Mill1,944 s40 min92%96.4%4050 (2.50 d)24
2. Combustor & Bearing Stack2,268 s50 min89%97.1%2044 (2.20 d)19
3. Fuel Control Hydromech Fit2,916 s65 min83%94.2%2052 (2.60 d)13
4. Starter-Generator Mate2,052 s30 min92%98.0%1028 (1.40 d)22
5. 5-Cycle Hot-Start Test Cell1,755 s45 min94%98.8%1022 (1.10 d)26

Key figures

Takt time
2,700 s
Lead time
11.5 d
Value-added time
10,935 s
Process cycle efficiency (PCE)
1.8%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
20 units
Line capacity per day
13 units
Bottleneck
Fuel Control Hydromech Fit

Reading the bottleneck

The bottleneck is "Fuel Control Hydromech Fit": it can process 13 units per day against a demand of 20 units, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 2,916 s to 3,730 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 83%), about 597 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.