Cooled Nozzle Guide Vane Stator Sector

Product family: Brazed Stator Vane Clusters.

Flow: Investment-casting foundry → EDM Airfoil Datum Clean → High-Temp Vacuum Braze Fit → Water-Flow Cooling Verify → TBC Ceramic Coat Spray → Airflow Throat Area Gauge → Turbine Stage 1 Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Cooled Nozzle Guide Vane Stator SectorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Investment-casting foundry → EDM Airfoil Datum Clean (748 s) → High-Temp Vacuum Braze Fit (872 s) → Water-Flow Cooling Verify (1,122 s) → TBC Ceramic Coat Spray (789 s) → Airflow Throat Area Gauge (675 s) → Turbine Stage 1 Assembly.SUPPLIERInvestment-castingfoundryI2.50 d1EDM Airfoil DatumCleanC/T 748 sI2.19 d2High-Temp VacuumBraze FitC/T 872 sI2.60 d3Water-FlowCooling VerifyC/T 1,122 sI1.40 d4TBC Ceramic CoatSprayC/T 789 sI1.10 d5Airflow ThroatArea GaugeC/T 675 sI1.50 dCUSTOMERTurbine Stage 1Assembly52 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. EDM Airfoil Datum Clean748 s40 min92%96.4%104130 (2.50 d)63
2. High-Temp Vacuum Braze Fit872 s50 min89%97.1%52114 (2.19 d)51
3. Water-Flow Cooling Verify1,122 s65 min83%94.2%52135 (2.60 d)35
4. TBC Ceramic Coat Spray789 s30 min92%98.0%2673 (1.40 d)58
5. Airflow Throat Area Gauge675 s45 min94%98.8%2657 (1.10 d)67

Key figures

Takt time
1,038 s
Lead time
11.4 d
Value-added time
4,206 s
Process cycle efficiency (PCE)
0.69%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
52 parts
Line capacity per day
35 parts
Bottleneck
Water-Flow Cooling Verify

Reading the bottleneck

The bottleneck is "Water-Flow Cooling Verify": it can process 35 parts per day against a demand of 52 parts, so it falls short of demand by 32.9%. Once downtime and scrap are counted, its cycle time grows from 1,122 s to 1,435 s, against a takt of 1,038 s. The largest loss at this step is equipment downtime (uptime 83%), about 230 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.