Ceramic Silicon-Nitride Mainshaft Engine Bearing
Product family: Zero-Slip Jet Hybrid Bearings.
Flow: Aerospace bearing-steel supplier → M50NiL Vacuum Heat-Treat → Sub-Micron Raceway Grind → Silver-Plated Cage Broach → Si3N4 Ball Size Sort <0.1um → Torque Vibration & Eddy NDT → Jet Engine Sump Cells
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. M50NiL Vacuum Heat-Treat | 324 s | 40 min | 92% | 96.4% | 240 | 300 (2.50 d) | 145 |
| 2. Sub-Micron Raceway Grind | 378 s | 50 min | 89% | 97.1% | 120 | 264 (2.20 d) | 117 |
| 3. Silver-Plated Cage Broach | 486 s | 65 min | 83% | 94.2% | 120 | 312 (2.60 d) | 81 |
| 4. Si3N4 Ball Size Sort <0.1um | 342 s | 30 min | 92% | 98.0% | 60 | 168 (1.40 d) | 133 |
| 5. Torque Vibration & Eddy NDT | 293 s | 45 min | 94% | 98.8% | 60 | 132 (1.10 d) | 154 |
Key figures
- Takt time
- 450 s
- Lead time
- 11.3 d
- Value-added time
- 1,823 s
- Process cycle efficiency (PCE)
- 0.30%
- Rolled throughput yield (RTY)
- 85.4%
- Customer demand per day
- 120 units
- Line capacity per day
- 81 units
- Bottleneck
- Silver-Plated Cage Broach
Reading the bottleneck
The bottleneck is "Silver-Plated Cage Broach": it can process 81 units per day against a demand of 120 units, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 486 s to 622 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 83%), about 99.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Jet Engines & Propulsion Systems: Jet Engines & Propulsion Systems
- Single-Crystal Nickel-Superalloy Turbine Blade Cast
- Powder-Metallurgy Nickel HPC Rotor Disk
- Laser-Drilled Effusion Cooling Combustor
- Cooled Nozzle Guide Vane Stator Sector
- Composite Fan Cowl & Exhaust Nacelle Build
- 150kW Aircraft Auxiliary Power Unit Assembly
- High-Bypass Geared Turbofan Final Line
- Liquid Hydrogen Cryogenic Rocket Valve
- LOX / Methane Rocket Engine Turbopump
- Additive-Printed Titanium Engine Fuel Nozzle
- Lobed Chevron Acoustic Jet Exhaust Mixer