Liquid Hydrogen Cryogenic Rocket Valve

Product family: 20K Sub-Zero Flow Valves.

Flow: Special alloy bar supplier → CNC Body & Poppet Lapping → PCTFE Cryo Seat Assembly → Cleanroom Oxygen Cleaning → Liquid Helium 20K Leak Test → 50-Cycle Cryo Actuation → Launch Vehicle Propulsion

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Liquid Hydrogen Cryogenic Rocket ValveSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Special alloy bar supplier → CNC Body & Poppet Lapping (1,215 s) → PCTFE Cryo Seat Assembly (1,418 s) → Cleanroom Oxygen Cleaning (1,823 s) → Liquid Helium 20K Leak Test (1,283 s) → 50-Cycle Cryo Actuation (1,097 s) → Launch Vehicle Propulsion.SUPPLIERSpecial alloybar supplierI2.50 d1CNC Body & PoppetLappingC/T 1,215 sI2.19 d2PCTFE Cryo SeatAssemblyC/T 1,418 sI2.63 d3Cleanroom OxygenCleaningC/T 1,823 sI1.38 d4Liquid Helium 20KLeak TestC/T 1,283 sI1.13 d550-Cycle CryoActuationC/T 1,097 sI1.50 dCUSTOMERLaunch VehiclePropulsion16 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CNC Body & Poppet Lapping1,215 s40 min92%96.4%3240 (2.50 d)19
2. PCTFE Cryo Seat Assembly1,418 s50 min89%97.1%1635 (2.19 d)15
3. Cleanroom Oxygen Cleaning1,823 s65 min83%94.2%1642 (2.63 d)10
4. Liquid Helium 20K Leak Test1,283 s30 min92%98.0%822 (1.38 d)16
5. 50-Cycle Cryo Actuation1,097 s45 min94%98.8%818 (1.13 d)18

Key figures

Takt time
1,688 s
Lead time
11.6 d
Value-added time
6,836 s
Process cycle efficiency (PCE)
2.2%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
16 units
Line capacity per day
10 units
Bottleneck
Cleanroom Oxygen Cleaning

Reading the bottleneck

The bottleneck is "Cleanroom Oxygen Cleaning": it can process 10 units per day against a demand of 16 units, so it falls short of demand by 38.1%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,332 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 83%), about 373 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.