LOX / Methane Rocket Engine Turbopump

Product family: High-RPM Cryo Inducers & Shafts.

Flow: 3D-Printed Nickel-Alloy & Ti → LPBF Powder Sinter & HIP → 5-Axis Inducer Blade Finish → Silicon Nitride Bearing Fit → Rotor 38,000 RPM Balance → LN2 Spin & Cavitation Test → Launch Engine Test Stand

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: LOX / Methane Rocket Engine TurbopumpSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 3D-Printed Nickel-Alloy & Ti → LPBF Powder Sinter & HIP (3,240 s) → 5-Axis Inducer Blade Finish (3,780 s) → Silicon Nitride Bearing Fit (4,860 s) → Rotor 38,000 RPM Balance (3,420 s) → LN2 Spin & Cavitation Test (2,925 s) → Launch Engine Test Stand.SUPPLIER3D-PrintedNickel-Alloy &TiI2.50 d1LPBF PowderSinter & HIPC/T 3,240 sI2.17 d25-Axis InducerBlade FinishC/T 3,780 sI2.67 d3Silicon NitrideBearing FitC/T 4,860 sI1.33 d4Rotor 38,000 RPMBalanceC/T 3,420 sI1.17 d5LN2 Spin &Cavitation TestC/T 2,925 sI1.50 dCUSTOMERLaunch EngineTest Stand6 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. LPBF Powder Sinter & HIP3,240 s40 min92%96.4%1215 (2.50 d)7
2. 5-Axis Inducer Blade Finish3,780 s50 min89%97.1%613 (2.17 d)5
3. Silicon Nitride Bearing Fit4,860 s65 min83%94.2%616 (2.67 d)4
4. Rotor 38,000 RPM Balance3,420 s30 min92%98.0%38 (1.33 d)6
5. LN2 Spin & Cavitation Test2,925 s45 min94%98.8%37 (1.17 d)7

Key figures

Takt time
4,500 s
Lead time
12.0 d
Value-added time
18,225 s
Process cycle efficiency (PCE)
5.6%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
6 units
Line capacity per day
4 units
Bottleneck
Silicon Nitride Bearing Fit

Reading the bottleneck

The bottleneck is "Silicon Nitride Bearing Fit": it can process 4 units per day against a demand of 6 units, so it falls short of demand by 38.1%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,216 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 83%), about 995 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Jet Engines & Propulsion Systems: Jet Engines & Propulsion Systems