Composite Fan Cowl & Exhaust Nacelle Build

Product family: Complete Propulsor Nacelles.

Flow: Nacelle panel suppliers → Cowl Structure Jig Drill → Titanium Fire-Seal Rivet → Anti-Ice Duct Pipe Routing → Hinge Latch & Hydraulic Rig → Full Engine Pod Fit Audit → Engine Podding Station

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Composite Fan Cowl & Exhaust Nacelle BuildSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nacelle panel suppliers → Cowl Structure Jig Drill (2,777 s) → Titanium Fire-Seal Rivet (3,240 s) → Anti-Ice Duct Pipe Routing (4,166 s) → Hinge Latch & Hydraulic Rig (2,931 s) → Full Engine Pod Fit Audit (2,507 s) → Engine Podding Station.SUPPLIERNacelle panelsuppliersI2.50 d1Cowl StructureJig DrillC/T 2,777 sI2.21 d2TitaniumFire-Seal RivetC/T 3,240 sI2.57 d3Anti-Ice DuctPipe RoutingC/T 4,166 sI1.43 d4Hinge Latch &Hydraulic RigC/T 2,931 sI1.07 d5Full Engine PodFit AuditC/T 2,507 sI1.50 dCUSTOMEREngine PoddingStation14 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cowl Structure Jig Drill2,777 s40 min92%96.4%2835 (2.50 d)17
2. Titanium Fire-Seal Rivet3,240 s50 min89%97.1%1431 (2.21 d)14
3. Anti-Ice Duct Pipe Routing4,166 s65 min83%94.2%1436 (2.57 d)9
4. Hinge Latch & Hydraulic Rig2,931 s30 min92%98.0%720 (1.43 d)16
5. Full Engine Pod Fit Audit2,507 s45 min94%98.8%715 (1.07 d)18

Key figures

Takt time
3,857 s
Lead time
11.6 d
Value-added time
15,621 s
Process cycle efficiency (PCE)
2.5%
Rolled throughput yield (RTY)
85.4%
Customer demand per day
14 units
Line capacity per day
9 units
Bottleneck
Anti-Ice Duct Pipe Routing

Reading the bottleneck

The bottleneck is "Anti-Ice Duct Pipe Routing": it can process 9 units per day against a demand of 14 units, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 4,166 s to 5,328 s, against a takt of 3,857 s. The largest loss at this step is equipment downtime (uptime 83%), about 853 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.