Ultra-High-Strength 300M Landing Gear Piston

Product family: Main Gear Shock Struts.

Flow: Landing-gear forging house → Gun-Drill Deep Bore → CNC Contour Turn & Mill → Vacuum Carburize & Quench → HVOF Carbide Thermal Spray → Mag-Particle & Bore Gage → Landing System Integrators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ultra-High-Strength 300M Landing Gear PistonSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Landing-gear forging house → Gun-Drill Deep Bore (2,314 s) → CNC Contour Turn & Mill (3,009 s) → Vacuum Carburize & Quench (4,166 s) → HVOF Carbide Thermal Spray (3,163 s) → Mag-Particle & Bore Gage (2,700 s) → Landing System Integrators.SUPPLIERLanding-gearforging houseI2.21 d1Gun-Drill DeepBoreC/T 2,314 sI2.43 d2CNC Contour Turn& MillC/T 3,009 sI2.79 d3Vacuum Carburize& QuenchC/T 4,166 sI2.21 d4HVOF CarbideThermal SprayC/T 3,163 sI1.21 d5Mag-Particle &Bore GageC/T 2,700 sI1.79 dCUSTOMERLanding SystemIntegrators14 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Gun-Drill Deep Bore2,314 s25 min96%99.4%2831 (2.21 d)22
2. CNC Contour Turn & Mill3,009 s35 min92%98.5%2134 (2.43 d)16
3. Vacuum Carburize & Quench4,166 s85 min83%95.0%1439 (2.79 d)9
4. HVOF Carbide Thermal Spray3,163 s30 min93%98.2%2131 (2.21 d)15
5. Mag-Particle & Bore Gage2,700 s15 min95%97.6%717 (1.21 d)18

Key figures

Takt time
3,857 s
Lead time
12.9 d
Value-added time
15,352 s
Process cycle efficiency (PCE)
2.2%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
14 parts
Line capacity per day
9 parts
Bottleneck
Vacuum Carburize & Quench

Reading the bottleneck

The bottleneck is "Vacuum Carburize & Quench": it can process 9 parts per day against a demand of 14 parts, so it falls short of demand by 33.9%. Once downtime and scrap are counted, its cycle time grows from 4,166 s to 5,283 s, against a takt of 3,857 s. The largest loss at this step is equipment downtime (uptime 83%), about 853 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 5-Axis Aerospace Machining & NDT: 5-Axis Aerospace Machining & NDT