30-Meter Long-Bed Wing Spar Milling

Product family: Single-Aisle Wing Spars.

Flow: Aerospace aluminum extrusion house → Ultrasonic Bar Integrity → Multi-Spindle Gantry Mill → Stress-Relief Cryo Stabilize → Shot-Peen Curvature Form → Laser Tracker Full Profile → Final Wing Drilling Jig

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 30-Meter Long-Bed Wing Spar MillingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aerospace aluminum extrusion house → Ultrasonic Bar Integrity (6,075 s) → Multi-Spindle Gantry Mill (7,898 s) → Stress-Relief Cryo Stabilize (10,935 s) → Shot-Peen Curvature Form (8,303 s) → Laser Tracker Full Profile (7,088 s) → Final Wing Drilling Jig.SUPPLIERAerospacealuminumextrusion houseI2.25 d1Ultrasonic BarIntegrityC/T 6,075 sI2.38 d2Multi-SpindleGantry MillC/T 7,898 sI2.75 d3Stress-ReliefCryo StabilizeC/T 10,935 sI2.25 d4Shot-PeenCurvature FormC/T 8,303 sI1.25 d5Laser TrackerFull ProfileC/T 7,088 sI1.75 dCUSTOMERFinal WingDrilling Jig8 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Ultrasonic Bar Integrity6,075 s25 min96%99.4%1618 (2.25 d)13
2. Multi-Spindle Gantry Mill7,898 s35 min92%98.5%1219 (2.38 d)9
3. Stress-Relief Cryo Stabilize10,935 s85 min83%95.0%822 (2.75 d)5
4. Shot-Peen Curvature Form8,303 s30 min93%98.2%1218 (2.25 d)9
5. Laser Tracker Full Profile7,088 s15 min95%97.6%410 (1.25 d)10

Key figures

Takt time
10,125 s
Lead time
13.1 d
Value-added time
40,299 s
Process cycle efficiency (PCE)
3.8%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
8 parts
Line capacity per day
5 parts
Bottleneck
Stress-Relief Cryo Stabilize

Reading the bottleneck

The bottleneck is "Stress-Relief Cryo Stabilize": it can process 5 parts per day against a demand of 8 parts, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 10,935 s to 13,868 s, against a takt of 10,125 s. The largest loss at this step is equipment downtime (uptime 83%), about 2,240 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 5-Axis Aerospace Machining & NDT: 5-Axis Aerospace Machining & NDT