Accessory Drive Gearbox Magnesium Casting

Product family: Helicopter Transmission Housings.

Flow: Magnesium casting foundry → Casting X-Ray & Pressure Test → Jig Bore Bearing Saddles → 5-Axis Oil Gallery Drill → Chromate Conversion Coat → CMM Concentricity → Rotorcraft Final Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Accessory Drive Gearbox Magnesium CastingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Magnesium casting foundry → Casting X-Ray & Pressure Test (1,800 s) → Jig Bore Bearing Saddles (2,340 s) → 5-Axis Oil Gallery Drill (3,240 s) → Chromate Conversion Coat (2,460 s) → CMM Concentricity (2,100 s) → Rotorcraft Final Assembly.SUPPLIERMagnesiumcasting foundryI2.22 d1Casting X-Ray &Pressure TestC/T 1,800 sI2.39 d2Jig Bore BearingSaddlesC/T 2,340 sI2.78 d35-Axis OilGallery DrillC/T 3,240 sI2.22 d4ChromateConversion CoatC/T 2,460 sI1.22 d5CMM ConcentricityC/T 2,100 sI1.78 dCUSTOMERRotorcraftFinal Assembly18 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Casting X-Ray & Pressure Test1,800 s25 min96%99.4%3640 (2.22 d)28
2. Jig Bore Bearing Saddles2,340 s35 min92%98.5%2743 (2.39 d)20
3. 5-Axis Oil Gallery Drill3,240 s85 min83%95.0%1850 (2.78 d)12
4. Chromate Conversion Coat2,460 s30 min93%98.2%2740 (2.22 d)20
5. CMM Concentricity2,100 s15 min95%97.6%922 (1.22 d)23

Key figures

Takt time
3,000 s
Lead time
12.8 d
Value-added time
11,940 s
Process cycle efficiency (PCE)
1.7%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
18 parts
Line capacity per day
12 parts
Bottleneck
5-Axis Oil Gallery Drill

Reading the bottleneck

The bottleneck is "5-Axis Oil Gallery Drill": it can process 12 parts per day against a demand of 18 parts, so it falls short of demand by 33.9%. Once downtime and scrap are counted, its cycle time grows from 3,240 s to 4,109 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 83%), about 664 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.