Main Rotor Helicopter Swashplate Assembly

Product family: Duplex Gimbal Swashplates.

Flow: Titanium forging supplier → Turn Gimbal Bearing Races → Multi-Axis Clevis Pocket → Fretting Tungsten Coat → Duplex Bearing Cryo Press → 100% Swash Friction Torque → Rotor Head Final Build

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Main Rotor Helicopter Swashplate AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Titanium forging supplier → Turn Gimbal Bearing Races (3,240 s) → Multi-Axis Clevis Pocket (4,212 s) → Fretting Tungsten Coat (5,832 s) → Duplex Bearing Cryo Press (4,428 s) → 100% Swash Friction Torque (3,780 s) → Rotor Head Final Build.SUPPLIERTitaniumforgingsupplierI2.20 d1Turn GimbalBearing RacesC/T 3,240 sI2.40 d2Multi-Axis ClevisPocketC/T 4,212 sI2.80 d3Fretting TungstenCoatC/T 5,832 sI2.20 d4Duplex BearingCryo PressC/T 4,428 sI1.20 d5100% SwashFriction TorqueC/T 3,780 sI1.80 dCUSTOMERRotor HeadFinal Build10 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Turn Gimbal Bearing Races3,240 s25 min96%99.4%2022 (2.20 d)16
2. Multi-Axis Clevis Pocket4,212 s35 min92%98.5%1524 (2.40 d)11
3. Fretting Tungsten Coat5,832 s85 min83%95.0%1028 (2.80 d)7
4. Duplex Bearing Cryo Press4,428 s30 min93%98.2%1522 (2.20 d)11
5. 100% Swash Friction Torque3,780 s15 min95%97.6%512 (1.20 d)13

Key figures

Takt time
5,400 s
Lead time
13.0 d
Value-added time
21,492 s
Process cycle efficiency (PCE)
3.1%
Rolled throughput yield (RTY)
89.1%
Customer demand per day
10 assemblies
Line capacity per day
7 assemblies
Bottleneck
Fretting Tungsten Coat

Reading the bottleneck

The bottleneck is "Fretting Tungsten Coat": it can process 7 assemblies per day against a demand of 10 assemblies, so it falls short of demand by 33.9%. Once downtime and scrap are counted, its cycle time grows from 5,832 s to 7,396 s, against a takt of 5,400 s. The largest loss at this step is equipment downtime (uptime 83%), about 1,195 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 5-Axis Aerospace Machining & NDT: 5-Axis Aerospace Machining & NDT