Widebody Landing Gear 10-Year Overhaul Bay

Product family: Certified Overhauled Gear Sets.

Flow: Aircraft Rotables Pool → Degrease & Hydraulic Strip → Cadmium Strip & Barkhausen → 300M Bush Bore & Chrome Grind → Plating Bake & Seal Rebuild → Proof Retraction & Weight QC → Widebody Hangar Lines

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Widebody Landing Gear 10-Year Overhaul BaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aircraft Rotables Pool → Degrease & Hydraulic Strip (11,970 s) → Cadmium Strip & Barkhausen (13,338 s) → 300M Bush Bore & Chrome Grind (18,810 s) → Plating Bake & Seal Rebuild (13,680 s) → Proof Retraction & Weight QC (10,260 s) → Widebody Hangar Lines.SUPPLIERAircraftRotables PoolI1.50 d1Degrease &Hydraulic StripC/T 11,970 sI1.75 d2Cadmium Strip &BarkhausenC/T 13,338 sI3.25 d3300M Bush Bore &Chrome GrindC/T 18,810 sI1.50 d4Plating Bake &Seal RebuildC/T 13,680 sI0.75 d5Proof Retraction& Weight QCC/T 10,260 sI0.75 dCUSTOMERWidebody HangarLines4 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Degrease & Hydraulic Strip11,970 s20 min95%97.5%26 (1.50 d)5
2. Cadmium Strip & Barkhausen13,338 s25 min92%98.1%37 (1.75 d)4
3. 300M Bush Bore & Chrome Grind18,810 s40 min82%91.5%413 (3.25 d)3
4. Plating Bake & Seal Rebuild13,680 s20 min93%97.6%26 (1.50 d)4
5. Proof Retraction & Weight QC10,260 s10 min97%99.1%13 (0.75 d)6

Key figures

Takt time
17,100 s
Lead time
10.5 d
Value-added time
68,058 s
Process cycle efficiency (PCE)
9.5%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
4 assemblies
Line capacity per day
3 assemblies
Bottleneck
300M Bush Bore & Chrome Grind

Reading the bottleneck

The bottleneck is "300M Bush Bore & Chrome Grind": it can process 3 assemblies per day against a demand of 4 assemblies, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 18,810 s to 25,070 s, against a takt of 17,100 s. The largest loss at this step is equipment downtime (uptime 82%), about 4,129 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.