High-Bypass Turbofan Full Performance Overhaul

Product family: 5000-Cycle Core Overhauls.

Flow: Airlines & Engine Lessors → Complete Module Teardown → Chem Strip, FPI & X-Ray Inspect → Blade Weld & Tip Grind NRC → Fan/Core/LPT Module Build → Sea-Level Pass-Off Run Cell → Airline Fleet Pools

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Bypass Turbofan Full Performance OverhaulSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Airlines & Engine Lessors → Complete Module Teardown (15,960 s) → Chem Strip, FPI & X-Ray Inspect (17,784 s) → Blade Weld & Tip Grind NRC (25,080 s) → Fan/Core/LPT Module Build (18,240 s) → Sea-Level Pass-Off Run Cell (13,680 s) → Airline Fleet Pools.SUPPLIERAirlines &Engine LessorsI1.33 d1Complete ModuleTeardownC/T 15,960 sI1.67 d2Chem Strip, FPI &X-Ray InspectC/T 17,784 sI3.33 d3Blade Weld & TipGrind NRCC/T 25,080 sI1.33 d4Fan/Core/LPTModule BuildC/T 18,240 sI0.67 d5Sea-LevelPass-Off Run CellC/T 13,680 sI0.67 dCUSTOMERAirline FleetPools3 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Complete Module Teardown15,960 s20 min95%97.5%24 (1.33 d)4
2. Chem Strip, FPI & X-Ray Inspect17,784 s25 min92%98.1%25 (1.67 d)3
3. Blade Weld & Tip Grind NRC25,080 s40 min82%91.5%310 (3.33 d)2
4. Fan/Core/LPT Module Build18,240 s20 min93%97.6%14 (1.33 d)3
5. Sea-Level Pass-Off Run Cell13,680 s10 min97%99.1%12 (0.67 d)5

Key figures

Takt time
22,800 s
Lead time
10.3 d
Value-added time
90,744 s
Process cycle efficiency (PCE)
12.8%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
3 units
Line capacity per day
2 units
Bottleneck
Blade Weld & Tip Grind NRC

Reading the bottleneck

The bottleneck is "Blade Weld & Tip Grind NRC": it can process 2 units per day against a demand of 3 units, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 25,080 s to 33,427 s, against a takt of 22,800 s. The largest loss at this step is equipment downtime (uptime 82%), about 5,505 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.