Weather Radome Moisture & RF Transmission Fix

Product family: Repaired Composite Nose Cones.

Flow: Airline Fleet MRO → Thermal IR Water Map → Damaged Core Scarf & Dry → Quartz Patch Vacuum Cure → Lightning Diverter Re-Bond → Anechoic Attenuation Sweep → Base Maintenance Bays

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Weather Radome Moisture & RF Transmission FixSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Airline Fleet MRO → Thermal IR Water Map (1,995 s) → Damaged Core Scarf & Dry (2,223 s) → Quartz Patch Vacuum Cure (3,135 s) → Lightning Diverter Re-Bond (2,280 s) → Anechoic Attenuation Sweep (1,710 s) → Base Maintenance Bays.SUPPLIERAirline FleetMROI1.42 d1Thermal IR WaterMapC/T 1,995 sI1.83 d2Damaged CoreScarf & DryC/T 2,223 sI3.17 d3Quartz PatchVacuum CureC/T 3,135 sI1.42 d4LightningDiverter Re-BondC/T 2,280 sI0.83 d5AnechoicAttenuation SweepC/T 1,710 sI0.83 dCUSTOMERBaseMaintenance…12 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Thermal IR Water Map1,995 s20 min95%97.5%617 (1.42 d)15
2. Damaged Core Scarf & Dry2,223 s25 min92%98.1%1022 (1.83 d)13
3. Quartz Patch Vacuum Cure3,135 s40 min82%91.5%1238 (3.17 d)8
4. Lightning Diverter Re-Bond2,280 s20 min93%97.6%517 (1.42 d)12
5. Anechoic Attenuation Sweep1,710 s10 min97%99.1%210 (0.83 d)17

Key figures

Takt time
2,850 s
Lead time
9.83 d
Value-added time
11,343 s
Process cycle efficiency (PCE)
3.4%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
12 units
Line capacity per day
8 units
Bottleneck
Quartz Patch Vacuum Cure

Reading the bottleneck

The bottleneck is "Quartz Patch Vacuum Cure": it can process 8 units per day against a demand of 12 units, so it falls short of demand by 36.6%. Once downtime and scrap are counted, its cycle time grows from 3,135 s to 4,178 s, against a takt of 2,850 s. The largest loss at this step is equipment downtime (uptime 82%), about 688 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.