Widebody Whole-Aircraft Strip & Livery Paint

Product family: Custom Airline Livery Bays.

Flow: Aerospace coatings supplier → Mask Glass & Laser Strip → Chromate Wash & Acid Etch → Epoxy Primer Electro-Coat → Stencil Basecoat & Clearcoat → Stall Marking & Weight Check → Airline Delivery Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Widebody Whole-Aircraft Strip & Livery PaintSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aerospace coatings supplier → Mask Glass & Laser Strip (35,910 s) → Chromate Wash & Acid Etch (40,014 s) → Epoxy Primer Electro-Coat (56,430 s) → Stencil Basecoat & Clearcoat (41,040 s) → Stall Marking & Weight Check (30,780 s) → Airline Delivery Centers.SUPPLIERAerospacecoatingssupplierI1.50 d1Mask Glass &Laser StripC/T 35,910 sI2.00 d2Chromate Wash &Acid EtchC/T 40,014 sI3.00 d3Epoxy PrimerElectro-CoatC/T 56,430 sI1.50 d4Stencil Basecoat& ClearcoatC/T 41,040 sI1.00 d5Stall Marking &Weight CheckC/T 30,780 sI1.00 dCUSTOMERAirlineDelivery…2 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Mask Glass & Laser Strip35,910 s20 min95%97.5%13 (1.50 d)3
2. Chromate Wash & Acid Etch40,014 s25 min92%98.1%24 (2.00 d)2
3. Epoxy Primer Electro-Coat56,430 s40 min82%91.5%26 (3.00 d)1
4. Stencil Basecoat & Clearcoat41,040 s20 min93%97.6%13 (1.50 d)2
5. Stall Marking & Weight Check30,780 s10 min97%99.1%12 (1.00 d)3

Key figures

Takt time
51,300 s
Lead time
12.0 d
Value-added time
204,174 s
Process cycle efficiency (PCE)
16.6%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
2 units
Line capacity per day
1 units
Bottleneck
Epoxy Primer Electro-Coat

Reading the bottleneck

The bottleneck is "Epoxy Primer Electro-Coat": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 33.4%. Once downtime and scrap are counted, its cycle time grows from 56,430 s to 75,210 s, against a takt of 51,300 s. The largest loss at this step is equipment downtime (uptime 82%), about 12,387 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Aircraft MRO & Heavy Overhaul: Aircraft MRO & Heavy Overhaul