Turboprop 6-Blade Composite Propeller Overhaul

Product family: Regional Turboprop Props.

Flow: Turboprop operators → Blade Pull & Pitch Hub Strip → Magnetic Particle Pitch Barrel → Blade Erosion Boot & Balance → Pitch Servo Rig & Torque → Static Dynamic Moment Chart → Regional Airline Fleets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Turboprop 6-Blade Composite Propeller OverhaulSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Turboprop operators → Blade Pull & Pitch Hub Strip (2,394 s) → Magnetic Particle Pitch Barrel (2,668 s) → Blade Erosion Boot & Balance (3,762 s) → Pitch Servo Rig & Torque (2,736 s) → Static Dynamic Moment Chart (2,052 s) → Regional Airline Fleets.SUPPLIERTurbopropoperatorsI1.40 d1Blade Pull &Pitch Hub StripC/T 2,394 sI1.80 d2Magnetic ParticlePitch BarrelC/T 2,668 sI3.20 d3Blade ErosionBoot & BalanceC/T 3,762 sI1.40 d4Pitch Servo Rig &TorqueC/T 2,736 sI0.80 d5Static DynamicMoment ChartC/T 2,052 sI0.80 dCUSTOMERRegionalAirline Fleets10 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Blade Pull & Pitch Hub Strip2,394 s20 min95%97.5%514 (1.40 d)12
2. Magnetic Particle Pitch Barrel2,668 s25 min92%98.1%818 (1.80 d)11
3. Blade Erosion Boot & Balance3,762 s40 min82%91.5%1032 (3.20 d)6
4. Pitch Servo Rig & Torque2,736 s20 min93%97.6%414 (1.40 d)10
5. Static Dynamic Moment Chart2,052 s10 min97%99.1%28 (0.80 d)15

Key figures

Takt time
3,420 s
Lead time
9.80 d
Value-added time
13,612 s
Process cycle efficiency (PCE)
4.1%
Rolled throughput yield (RTY)
84.6%
Customer demand per day
10 assemblies
Line capacity per day
6 assemblies
Bottleneck
Blade Erosion Boot & Balance

Reading the bottleneck

The bottleneck is "Blade Erosion Boot & Balance": it can process 6 assemblies per day against a demand of 10 assemblies, so it falls short of demand by 36.6%. Once downtime and scrap are counted, its cycle time grows from 3,762 s to 5,014 s, against a takt of 3,420 s. The largest loss at this step is equipment downtime (uptime 82%), about 826 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Aircraft MRO & Heavy Overhaul: Aircraft MRO & Heavy Overhaul