Composite Thrust Reverser Acoustic Patch
Product family: Rebuilt Nacelle Cowls.
Flow: Engine Shop Feeder → Tap-Test & UT Delam Map → Corroded Honeycomb Route → Hot-Bonder Vacuum Cure Patch → Actuator Seal & Slide Check → C-Scan Integrity Sign-Off → Engine Podding Shop
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Tap-Test & UT Delam Map | 5,985 s | 20 min | 95% | 97.5% | 4 | 11 (1.38 d) | 10 |
| 2. Corroded Honeycomb Route | 6,669 s | 25 min | 92% | 98.1% | 6 | 14 (1.75 d) | 9 |
| 3. Hot-Bonder Vacuum Cure Patch | 9,405 s | 40 min | 82% | 91.5% | 8 | 26 (3.25 d) | 5 |
| 4. Actuator Seal & Slide Check | 6,840 s | 20 min | 93% | 97.6% | 3 | 11 (1.38 d) | 9 |
| 5. C-Scan Integrity Sign-Off | 5,130 s | 10 min | 97% | 99.1% | 2 | 6 (0.75 d) | 12 |
Key figures
- Takt time
- 8,550 s
- Lead time
- 9.75 d
- Value-added time
- 34,029 s
- Process cycle efficiency (PCE)
- 5.1%
- Rolled throughput yield (RTY)
- 84.6%
- Customer demand per day
- 8 units
- Line capacity per day
- 5 units
- Bottleneck
- Hot-Bonder Vacuum Cure Patch
Reading the bottleneck
The bottleneck is "Hot-Bonder Vacuum Cure Patch": it can process 5 units per day against a demand of 8 units, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 9,405 s to 12,535 s, against a takt of 8,550 s. The largest loss at this step is equipment downtime (uptime 82%), about 2,065 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Aircraft MRO & Heavy Overhaul: Aircraft MRO & Heavy Overhaul
- Narrowbody A320/737 Heavy C-Check Hangar
- High-Bypass Turbofan Full Performance Overhaul
- Widebody Landing Gear 10-Year Overhaul Bay
- Part-145 Avionics LRU Bench Repair & Mod
- Commercial APU Turbine Hot-Section Overhaul
- Weather Radome Moisture & RF Transmission Fix
- Widebody Whole-Aircraft Strip & Livery Paint
- Business-Class Lie-Flat Seat Refurbishment
- High-Temp Bleed Air & Starter Valve Rebuild
- Carbon Disc Wheel & Brake MRO Turnaround
- Turboprop 6-Blade Composite Propeller Overhaul